Every pull_request and merge group already took the Bazel lanes for the
retired tiers (BAZEL_RETIRES_LEGACY_* and BAZEL_COVERS_FORKS all "true",
and pr.yml/pr-risk.yml run on no other event), so the legacy jobs those
flags stood down could never run again. Remove them with their decision:
- pr-risk.yml: build-embedded, test-embedded-{storage,conformance,cmd},
test-proxied-cmd, test-server-storage{,-full}, detect-ci-tier (and its
ci-embedded-tier.sh / ci-capability-selector.sh scripts) and
bazel-coverage. PR Risk keeps the Nix packaging check (test-nix) and its
gate, PR Risk Gate / Required.
- pr.yml: build-artifacts, check-cmd-bd-puregeo-tests, pr-core-wrapper and
bazel-coverage; the BAZEL_RETIRES_LEGACY_* and BAZEL_COVERS_FORKS flags.
The three BAZEL_*_RETIRED gate ids become one, BAZEL_REMOTE: the Bazel
call must have run remotely (remote, fork-ro or fork-rw) on every PR and
merge group, each lane's own id still required. Gate names unchanged.
Policy tests: the D2 decision matrix becomes
TestPRGateRequiresRemoteBazelLanes (bazel.yml's actual rbe step and
pr.yml's actual gate over every event/variable/secret/fork/actor/mint
fact); the parity tests that read the legacy jobs now pin the Bazel lanes
against those jobs' frozen commands.
ga-96smfk.22
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>