beads/cmd/bd/protocol
Julian Knutsen ce661175ff
ci(bazel): retire the docker A/B variants and pr.yml's container jobs (#7340)
The dolt-server lane (--config=doltserver) has been the only pre-merge run
of the Dolt-backed domain, uow, tracker, doctor/fix and protocol suites
since BAZEL_COVERS_FORKS went "true": bazel-coverage reports pr_lanes=true
for every pull_request and merge_group, so pr.yml's test-domain-uow and
contract-corpus never run. An A/B run of every requires-docker target
against its dolt-server twin on the same commit shows identical test sets
and statuses (2683 testcases) except TestDoltServerFingerprint/container,
the container half of the fingerprint, which needs docker by design.

Delete the six requires-docker sh_tests, test:docker in .bazelrc, the
requires-docker tag from the taxonomy and lane filters, bazel.yml's
dolt-lane dispatch input and image pull, and pr.yml's test-domain-uow and
contract-corpus jobs with their ci-gate wiring. The testcontainers backend
in internal/testutil stays: it is plain go test's default. pull-dolt-image.sh
stays for pr-risk.yml's legacy tiers. No required check changes: the
rulesets require only CI Gate / Required and PR Risk Gate / Required.

Refs ga-96smfk.21

Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-07 04:13:24 +00:00
..
testdata/corpus Merge release/1.3.0 into main (post-tag forward-port) 2026-09-15 22:09:13 +00:00
assignee_test.go test(protocol): pin data-model + ready-front production-scar clauses (wy-nzybu) 2026-07-13 09:46:16 -07:00
blocked_status_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
blocked_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
blocking_semantics_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
BUILD.bazel ci(bazel): retire the docker A/B variants and pr.yml's container jobs (#7340) 2026-10-07 04:13:24 +00:00
canonicalize_test.go test(protocol): make corpus determinism pure (bd-qq1qn) (#5281) 2026-08-02 07:14:30 -07:00
CATALOG.md Merge remote-tracking branch 'upstream/main' into pr-4232-fix 2026-07-13 20:43:10 -07:00
child_id_test.go test(protocol): pin data-model + ready-front production-scar clauses (wy-nzybu) 2026-07-13 09:46:16 -07:00
children_test.go fix(cli): implement children pretty and defer reason 2026-06-13 21:22:38 -07:00
close_guard_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
comments_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
corpus.go fix(contracts): JSON contract fixes before 1.3.0 freezes them — string revision tokens, --set-metadata scalar typing, create --json nano timestamps (#6053) 2026-08-29 05:20:27 +00:00
corpus_test.go test(protocol): make corpus determinism pure (bd-qq1qn) (#5281) 2026-08-02 07:14:30 -07:00
defer_test.go fix(cli): implement children pretty and defer reason 2026-06-13 21:22:38 -07:00
dep_identity_test.go test(protocol): pin data-model + ready-front production-scar clauses (wy-nzybu) 2026-07-13 09:46:16 -07:00
errors_contract_test.go test(protocol): pin §E/§M/§V conformance clauses at the CLI level (wy-ge2h8) 2026-07-13 10:30:24 -07:00
exit_codes_init_test.go test(protocol): pin §E3 exit 11 with a PTY harness (wy-vh5y8) (#4762) 2026-10-06 23:06:06 +00:00
exit_codes_test.go Beads #6648: report partial batch-close failure (#6740) 2026-09-26 13:55:44 -07:00
helpers_test.go test(testutil): opt-in local dolt sql-server backend for Dolt-backed tests (#6891) 2026-09-28 04:06:49 -07:00
input_validation_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
interchange_test.go test(protocol): pin the §J interchange clauses; fix the bd import header gap (wy-ltox1) 2026-07-13 11:20:06 -07:00
json_contract_test.go fix(show): flag comment_count as omitted when comments are not streamed (#4865) 2026-07-25 16:16:41 -07:00
lease_claim_test.go test: fix red main — init-cancel E2E deadline + reclaim JSON assertion (#5039) 2026-07-25 10:10:18 -07:00
lifecycle_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
memory_contract_test.go test(protocol): pin §E/§M/§V conformance clauses at the CLI level (wy-ge2h8) 2026-07-13 10:30:24 -07:00
preservation_test.go test(protocol): realign show --json contract tests with count-only payload (wy-017ry) 2026-07-13 10:08:34 -07:00
ready_front_test.go test: make ready ordering setup deterministic (bd-y9cjq) (#5238) 2026-08-01 09:55:11 -07:00
roundtrip_test.go test(protocol): realign show --json contract tests with count-only payload (wy-017ry) 2026-07-13 10:08:34 -07:00
stale_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
status_validation_test.go feat(test): parallelize protocol tests for 3x speedup (bd-dgp) 2026-02-27 20:04:00 -08:00
versioning_contract_test.go test(protocol): pin §E/§M/§V conformance clauses at the CLI level (wy-ge2h8) 2026-07-13 10:30:24 -07:00
wp4_helpers_test.go test(protocol): pin §E/§M/§V conformance clauses at the CLI level (wy-ge2h8) 2026-07-13 10:30:24 -07:00