beads/cmd/bd/critical_paths_test.go
Julian Knutsen a2d43e6792
fix(mol): molecule reads, auto-close and close --continue over http through issueops entries (S16) (#7513)
* fix(create): let a remote backend mint the --parent child id

`bd create --parent` always called the raw GetNextChildID first, which the
http backend does not serve, so every child create on a remote workspace
refused before writing anything. The Lifecycle role already mints
<parent>.<n> for a create that carries a ParentID and no id of its own, on
every backend and inside the create's own transaction; conformance
RunIssueOperationsCreateUnderAParentMintsTheNextChildID pins it on every leg,
the served one included (and the bd-enterprise postgres leg the MC server
runs). So the create route needs no new capability token: on a registered
Remote backend the client skips the raw reservation and lets the server mint.
The local route keeps its reservation so its Dolt commit staging is
unchanged, and an explicit --id beside --parent is still refused up front.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(mol): molecule reads, auto-close and close --continue over issueops roles

Over the http backend three molecule paths failed, and two of them
silently:

- `bd mol current` / `bd mol progress` without an id answered "no molecules"
  because the in_progress listing (a raw SearchIssues shape) and the parent
  walk (raw GetDependencyRecordsForIssues) were refused and the refusal was
  swallowed; with an id they refused on raw GetMoleculeProgress.
- The molecule auto-close after `bd close` never ran: findParentMolecules
  swallowed the same refused edge read into "not part of a molecule".
- `bd close --continue` claimed the next step in a raw RunInTransaction.

The direct route now reads molecules through roleMolStore, which answers
through roles every backend serves: EdgeReader (batched at the wire's 100
anchors) for the parent walk, BatchGetter for the roots (Get per id where a
server does not publish issues.batchGet), Relations for the step rows (full
rows; the raw dependents read over http is getIssue's shallow projection,
which zeroed step assignees) and the progress counts, and Reader.List for the
in_progress/hooked listings. The auto-close closes the root through
Lifecycle.Close, and the --continue claim is one Lifecycle.Update guarded by
ExpectedStatus=open.

No refusal is swallowed any more: findParentMolecules, the molecule finders
and the hooked scan return their errors; `mol current/progress` report them;
the auto-close stays best effort but warns on stderr; AdvanceToNextStep only
moves on to the next ready step when the claim LOST a race (status mismatch,
not claimable, already claimed) and returns anything else. The one heuristic
still skipped is the id-pattern heal in loadDescendants, and only for an
ErrUnsupported backend that cannot express an id-prefix search; other
failures now surface. `mol current`/`mol progress` leave the
types.IssueFilter forbidigo hole, since they no longer build a filter.

gc does not depend on bd's molecule auto-close: it runs its own
(cmd/gc/molecule_autoclose.go, from the bd on_close hook and the
controller's bead-close events). Its worker prompts do run `bd mol current`.

Served e2e (TestE2E_MoleculesOverHTTP): create --parent mints <root>.1/.2,
mol current <id> is non-empty with the full in-progress step, mol progress
counts, close --continue auto-advances, closing the last step auto-closes
the root. `mol current` without an id now refuses out loud on this stack
(asserted: never an empty list); its non-empty assertion is skipped until
S6c (externaldeps reader passthrough) is underneath.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(mol): list molecule candidates with the four wire knobs, drop the S6c skip

On top of S6c the in_progress listing behind 'bd mol current' (no id)
reaches the v0 wire encoder, which refuses ListRequest.IncludeAllTypes.
Ask for templates, gates, infra and ephemeral rows explicitly, which the
wire publishes, and run the 'mol current without an id' served case.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* feat(issueops): one library entry each for molecule auto-close, advance and reads

The molecule rules lived only in cmd/bd, in copies that disagreed: two
auto-close implementations that closed the root through different
library entries outside the step close's transaction, a `close
--continue` claim that set no assignee and could take a step another
agent held on the direct and http routes, and three progress counts.
Every molecule rule now has one implementation in the public issueops
package, composed over three roles every backend serves (BatchGetter,
Relations, EdgeReader): MoleculeRoots, LoadMolecule, AnalyzeMolecule,
ViewMolecule, ReadMoleculeProgress, ActiveMoleculeIDs,
CompletedMolecule. Membership is the parent-child edge.

Auto-close: CloseRequest.AutoCloseMolecule and
CloseBatchRequest.AutoCloseMolecule (opt-in, so gc's own auto-close is
not doubled) close the molecule root a close completed IN THE SAME
TRANSACTION, unforced and guarded on the root revision read there:
storageissueops.CloseCompletedMoleculeInTx on the store backends (the
role bodies bound to the caller's tx, TxMoleculeReader) and
uow.CloseCompletedMoleculeInUOW on the unit of work. It replays on an
idempotent re-close, reports the root on CloseResult/CloseOutcome
.AutoClosedMolecule, and a root its own close policy refuses stays open
and is reported (MoleculeAutoCloseRefusal) without failing the step.

Advance: a new MoleculeStepper role (storage.DoltStorage accessor,
uow.MoleculeStepperSource) whose one implementation,
issueops.NewMoleculeStepper, claims the next ready step through the
Claimer (Lifecycle.Update's Claim for a wisp step): assignee set, a step
another actor holds skipped, never taken.

HTTP: closeIssue/batchCloseIssues carry auto_close_molecule behind the
issues.close.autoCloseMolecule behavior token, and POST
/v0/beads/issues/{id}:advanceMolecule (issues.advanceMolecule) serves
the stepper. Handlers only decode, call the role and encode. The client
sends the member and dials the operation only where advertised; against
an older server it DEGRADES rather than refuses — it runs the same
library rule over its own roles (issueops.CloseCompletedMolecule after
the close, NewMoleculeStepper for the advance), so the outcome is the
same in more round trips. The capability fallbacks that lived in
cmd/bd move into the client: BatchGetter answers one getIssue per id
without issues.batchGet, and EdgeReader splits past the operation's 100
anchors.

Conformance: RunMolecule* on dolt, embedded, uow and http (the http leg
twice: served, and against a server with the tokens struck out).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* refactor(cmd/bd): molecule commands and create --parent through the library entries

`bd close`, `bd close --continue`, `bd mol current`, `bd mol progress`,
`bd ready --mol` and `bd create --parent` now call the one library entry
for each rule on every route (direct, proxied server, remote):

- close (batch, --if-revision, proxied) sets CloseRequest/
  CloseBatchRequest.AutoCloseMolecule and only reports what the library
  closed in the step close's transaction. autoCloseCompletedMolecule,
  autoCloseProxiedCompletedMolecule and closeCompletedMoleculeRoot are
  gone, and so is the separate post-close write.
- --continue is the route's MoleculeStepper role: a real claim (the
  assignee is set) that skips a step another actor holds. Before, the
  direct and http routes flipped the status only and could take it.
  AdvanceToNextStep, ClaimStepIfOpen and its two implementations are
  gone.
- mol current / mol progress / ready --mol read through
  issueops.ViewMolecule, ReadMoleculeProgress, ActiveMoleculeIDs and
  LoadMolecule/AnalyzeMolecule over the route's roles. Over http this
  fixes the missing step assignee on `ready --mol` (corpus mark
  mc-ready-mol). The proxied route's SearchIssues fallback, the role
  store, the third progress count and the cmd/bd copy of the readiness
  analysis are deleted; only presentation stays here.
- create --parent asks the create role to mint the child id on every
  route (the local CLI reservation is gone) and to inherit the parent's
  labels (InheritLabelsFromParent) inside the create. The dry-run
  preview still shows the labels, and a failed label read there is
  reported, not swallowed.

TestProxiedServerMoleculeLifecycleAgreesOnEveryRoute runs one molecule
lifecycle through the real binary on the direct, proxied and remote
(`bd connect` to `bd serve`) routes and requires the same rows and the
same JSON on all three. The served e2e now also pins the held-step skip,
the claimed step's assignee and the full rows of `ready --mol`.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(httpclient): refuse molecule auto-close and advance before dialing an older server

The client used to DEGRADE against a server without
issues.close.autoCloseMolecule / issues.advanceMolecule: it closed the step
without the member and ran a second, client-side copy of the auto-close
(issueops.CloseCompletedMolecule) in its own transactions, and composed the
stepper over its own roles. That kept two executions of each rule alive.
Now the rule runs in ONE place, the server's library: a close or batch close
that sets AutoCloseMolecule, and an Advance, refuse before anything is dialed
with the typed capability error (storage.ErrUnsupported, Capability naming the
token). The composed single-item batch leg now carries the member too.

- issueops.CloseCompletedMolecule (the role-composed form) is gone.
  MoleculeRootClose is the one root close request (unforced, the auto-close
  reason, the session, guarded on the root revision read), and both
  in-transaction bodies (storage issueops CloseCompletedMoleculeInTx, uow
  CloseCompletedMoleculeInUOW) build from it.
- MoleculeView.Ready is `bd ready --mol`'s list (every analysis-ready node,
  hydrated), so ready --mol and mol current derive from ViewMolecule alone.

Tests: unit pre-dial refusal and member pins (httpclient molecule_test.go),
TestServedMoleculeRefusesAgainstAnOlderServer (step stays open, nothing
claimed) replacing the degraded contract arm.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(cmd/bd): ask for the molecule auto-close only where the route serves it

The refuse-before-dialing client made every `bd close` over http fail
against a server that does not advertise issues.close.autoCloseMolecule
(an older bd serve, or the MC server shape, whose orchestrator owns the
molecule lifecycle): the CLI always set AutoCloseMolecule.
storage.ServesMoleculeAutoClose answers, through every decorator, whether a
store's closes may carry the flag (MoleculeAutoCloseProber, implemented by
httpclient.Store from its handshake; every local backend serves it). The
direct batch close and the --if-revision close set the flag from it; the
proxied route always serves it. Against a silent server the close goes out
without the member and the server's side owns the auto-close.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* test(backend/http): scope the advertised-policy check to reads before the close

The close policy check is the client-side policy's last chance: it runs
before the close request, so only the reads up to that request count. A
read after the close (the old-server molecule notice reads the closed
step's edges) is not the external-dependency policy.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* test(backend/http/corpus): drop the six marks S16 and S19 retire

With the molecule library entries underneath, mol current (with and
without an id, json and text), mol progress and ready --mol read through
issueops.LoadMolecule over the roles, and create --parent lets the server
mint the child id. Those six shapes pass on the reference profile.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(cmd/bd): never silent against a server without the molecule tokens

Against a server that advertises neither issues.close.autoCloseMolecule
nor issues.advanceMolecule (an older bd serve, or one whose orchestrator
owns the molecule lifecycle):

- `bd close --continue` closed the step and only then found the advance
  refused, leaving the step closed and the next step unclaimed. It now
  asks storage.ServesMoleculeAdvance (a MoleculeAdvanceProber the http
  store answers from its handshake; local backends always serve it)
  BEFORE the close and refuses up front, saying nothing was closed.
- `bd close` went out without auto_close_molecule and said nothing. When
  the closed step belongs to a molecule (issueops.MoleculeRoot), a notice
  on stderr now names the molecule and the missing token: its auto-close
  is the server's to run. The batch and --if-revision closes both say it.

The served e2e masks both tokens out of the handshake and checks the
up-front refusal (the step stays open) and the notice; the httpclient
unit test pins ServesMoleculeAdvance to the handshake.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* refactor(cmd/bd): mol show through issueops.LoadMolecule on every route

`bd mol show` still loaded the molecule through cmd/bd's
loadTemplateSubgraph (raw GetIssue, GetDependentsWithMetadata and
GetDependencyRecords, plus an id-pattern child probe), while mol current,
mol progress and ready --mol read through the library. It now loads
through issueops.LoadMolecule over the route's molecule roles (the direct
store's, or the proxied provider's), so membership is the parent-child
edge everywhere and the http route reads through roles the server serves.
The served e2e checks mol show's root and step count.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* docs: the molecule auto-close fails the step's close on a non-policy error; stale comments

CloseRequest.AutoCloseMolecule and CloseCompletedMoleculeInTx now say what
changed when the auto-close moved into the close's transaction: a root
close the close policy refuses still leaves the root open and is reported,
but any other failure (a storage error, a lost race on the root's revision)
fails the step's close with it, where the CLI used to close the root
afterwards and only warn.

Stale: the advanceMolecule vocabulary entry said the client composes the
stepper over its own roles when unserved (it refuses before dialing), and
the graph-create collision probe called itself best-effort by transport
(the http GetIssue miss is storage.ErrNotFound like every other store's).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* docs(changelog): the molecule tokens and the S16/S19 behaviours

Entries for issues.close.autoCloseMolecule and issues.advanceMolecule, the
issueops molecule entries, the auto-close inside the step's close (and a
non-policy failure of it failing the close), the real claim behind
close --continue, the molecule reads on every route, the notice and the
up-front --continue refusal against a server without the tokens, and
create --parent / mol reads over http.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(httpclient): regenerate unsupported_gen.go for MoleculeStepper

The PR adds MoleculeStepper() to storage.DoltStorage (200 -> 201
methods). httpclient implements it by hand, but the generated shell's
trailer still counted 200, so
//internal/storage/unsupportedgen:unsupportedgen_test
(TestGeneratedShellIsFresh) failed in Bazel / test and
Bazel / integration, turning CI Gate / Required red.

Regenerated with `go generate ./internal/httpclient`; the only change
is the trailer count (143 of 201 methods generated; 58 left).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

* fix(molecule): auto-close refusals, write skew, close --json, docs

Review fixes for #7513, numbered as in each iteration's review
synthesis.

Iteration 1:

F1: a close guard's refusal of the root (TemplateReadOnlyError,
PinnedError, CloseNotAssigneeError) is an auto-close refusal, like the
close policy's: the root stays open and is reported, and the step's
close stands. Pinned by the new conformance case
RunMoleculeGuardedRootKeepsTheStepClose on dolt, embedded, uow and the
served http client.

F2: two closes that finish a molecule's last two steps in concurrent
transactions each read the other's step as open, so neither closed the
root and both committed. Every auto-close now rewrites the root's
coordination cell before it decides the root (local_metadata
molecule-coordination/v1/<shard>, the dependency coordination idiom and
sharding with a FreshRowLock value), in both twins
(CloseCompletedMoleculesInTx and CloseCompletedMoleculesInUOW). Two
deciders of one root now conflict at commit (1213), and the retry reads
the winner's close and closes the root. This is the synthesis's option
(c), applied through a coordination cell instead of the root row; it
needs no post-commit second transaction and no engine lock. The
deterministic two-transaction regression fails without the touch and
passes with it on dolt and uow; the concurrent-close tests end with the
root closed in every round, reported by exactly one close.

F3: the auto-close checks the root's eligibility before walking any
step, MoleculeStepsClosed stops at the first open step, and a batch
decides each root once and reports it on the first item under it.

F4: ErrVersionMismatch on the root is not a refusal; it fails the
step's close with it. The classifier unit test pins this. A conformance
case cannot stage that race deterministically through the public roles.

F5: storage.ServesMoleculeAdvance answers (bool, error), and bd close
--continue refuses before closing anything when the handshake cannot be
read.

F6: the CHANGELOG and the stepper and batch-closer doc comments say
what the code does.

F7: the unserved-auto-close notice fires only when the close left an
auto-closing molecule with every step closed and its root open
(issueops.CompletedMolecule): again on a re-close, once per root in a
batch, never for a step under an ordinary epic or an unfinished
molecule. Proxied mol show, mol current and mol progress again report a
read unit of work that cannot be opened as itself, not as a molecule
that was not found.

F8: the write-ledger comment says the close is refused before dialing.
The dead FirstClosed/LastClosed guards in mol progress pre-exist on main
and are left as they are.

Iteration 2:

F1: on the proxied route, bd ready --mol reported a read unit
of work it could not open twice: once as itself, then as "molecule
'<id>' not found", which under --json is a second error document on
stdout. It now returns moleculeNotResolved, as mol show, mol current and
mol progress do. TestProxiedReadyMolReportsAnUnopenableReadOnce drives
runMoleculeReady with a provider whose NewUOW fails and wants one Error:
line, or one JSON document; both subtests fail with the old return.

F2: the coordination cell serializes every concurrent close of a step
under an open auto-closing root, not only the closes that finish the
molecule. That is the price of deciding the root in the step's
transaction, so it is documented (TouchMoleculeCoordinationInTx, the
UOW twin, CloseRequest.AutoCloseMolecule, the CHANGELOG) and pinned on
dolt and uow: two sibling closes with a third step still open conflict
(both commit when the touch is removed, on either twin), and a six-step
fan-out closes every step through the store's retry, with the root
closed and reported by exactly one close. The synthesis's alternative,
a post-commit recheck by any close that read a step open, is not taken:
it is a second, best-effort transaction after the step's commit, the
shape this PR exists to remove.

F3: MoleculeRootClose's doc no longer promises that a step reopened
between the completion read and the root close fails the step's close.
The guard is the root's RowVersion, which a step reopen never writes;
the doc now says what the guard covers and that this race goes
undetected (it is inherited from the CLI's old post-commit auto-close).

F4: the user docs describe the auto-close. docs/workflows/molecules.md
replaces "Closing the last child does not close the molecule root"
with which roots close and which stay open, the refusal warning, the
unserved-server note and the --json members, and documents the claiming
--continue and parent-child step membership;
docs/reference/json-schema.md gains a bd close --json section. These
are main-only behaviors on pages pinned to v1.2.2 (docs/cli-docs.pin):
a maintainer call against §1 of
engdocs/decisions/2026-07-17-docs-release-pin.md, as in #6508, #5855,
#5997 and #5092. The auto-close itself shipped in v1.2.2
(cmd/bd/close.go autoCloseCompletedMolecule), so the old sentence was
already wrong at the pin. docs/cli-reference/ is generated from the
pinned release and is not hand-edited; the bd close and bd mol show
help texts carry the same facts and reach it at the next pin bump.

F5: bd close --json reports the auto-close. The entry of a close that
completed a molecule gains auto_closed_molecule (the root it closed) or
molecule_auto_close_refusal (why the root stayed open), the HTTP API's
names, on the direct, proxied and --if-revision routes. The members sit
beside the issue's own rather than wrapping the output in an object the
way --suggest-next does: an object would change the output's shape
exactly when a close completes a molecule and break every consumer that
reads an array, while members leave each entry decoding as the closed
issue, compose with `closed` under the flag objects, and leave a plain
close's bytes unchanged. Pinned on the embedded and proxied tiers
(TestEmbeddedCloseJSONReportsMoleculeAutoClose, TestProxiedServerClose2B
json_reports_*, and both --if-revision replay tests), all red without
the change.

F6: cmd/bd's BeadsTemplateLabel is issueops.MoleculeTemplateLabel, so
the template commands and molecule membership cannot drift apart.

F7: the UOW twin's revision probe says that it writes nothing,
and the BatchCloseRequest.auto_close_molecule spec description has its
verb back (apigen regenerated, no drift).

Iteration 3:

F1: on the unit-of-work route (bd serve, the proxied CLI), a refused
root's molecule_auto_close_refusal and warning carried the use case's
and repository's wrapping ("close <id>: db:
IssueSQLRepository.CloseChecked <id>: ...") around the refusal, where
the tx twin and the docs give the refusal alone. Both twins now report
it through RefusedMoleculeAutoClose, which answers the refusing guard's
or policy's own sentence. RunMoleculeRefusedRootKeepsTheStepClose,
RunMoleculeGuardedRootKeepsTheStepClose and the embedded and proxied
close --json tests want that exact sentence; the uow conformance leg
and the proxied test fail without the unwrap.

F2: the docs no longer promise ErrVersionMismatch for a write to the
root that races its auto-close. The root's read and its revision check
share one transaction snapshot, so that write conflicts with the root
close at commit and the retry decides the root again; the close fails
only if it still conflicts when its retry budget runs out
(MoleculeRootClose, IsMoleculeAutoCloseRefusal,
CloseRequest.AutoCloseMolecule, the tx twin's comment, the CHANGELOG
and the OpenAPI description, apigen regenerated).

F3: TestEmbeddedCloseJSONReportsMoleculeAutoClose moves above
TestEmbeddedCloseConcurrent's doc comment, which documents its own test
again.

F4: bd mol progress counting direct steps while the auto-close counts
every descendant predates this PR; it is left for a follow-up.

F5: cmd/bd's molReader drops GetMoleculeProgress, which nothing called
once mol progress read through issueops.ReadMoleculeProgress.

Agent-Signature: claude-code-claude-opus-5-5-max on behalf of Gas City Adopt-PR
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

---------

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-12 19:50:34 +00:00

746 lines
21 KiB
Go

//go:build cgo
package main
import (
"context"
"fmt"
"path/filepath"
"testing"
"time"
"github.com/steveyegge/beads/internal/storage"
"github.com/steveyegge/beads/internal/types"
"github.com/steveyegge/beads/issueops"
)
// TestBurnWisps tests direct wisp deletion via burnWisps.
func TestBurnWisps(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("DeletesSingleWisp", func(t *testing.T) {
wisp := &types.Issue{
Title: "Wisp to burn",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp: %v", err)
}
result, err := burnWisps(ctx, s, []string{wisp.ID}, "test")
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 1 {
t.Errorf("DeletedCount = %d, want 1", result.DeletedCount)
}
if len(result.DeletedIDs) != 1 || result.DeletedIDs[0] != wisp.ID {
t.Errorf("DeletedIDs = %v, want [%s]", result.DeletedIDs, wisp.ID)
}
// Verify wisp is actually gone
_, err = s.GetIssue(ctx, wisp.ID)
if err == nil {
t.Error("Expected error getting deleted wisp, got nil")
}
})
t.Run("DeletesMultipleWisps", func(t *testing.T) {
var ids []string
for i := 0; i < 3; i++ {
wisp := &types.Issue{
Title: "Batch wisp",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp %d: %v", i, err)
}
ids = append(ids, wisp.ID)
}
result, err := burnWisps(ctx, s, ids, "test")
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 3 {
t.Errorf("DeletedCount = %d, want 3", result.DeletedCount)
}
if len(result.DeletedIDs) != 3 {
t.Errorf("DeletedIDs length = %d, want 3", len(result.DeletedIDs))
}
})
t.Run("EmptyIDs", func(t *testing.T) {
result, err := burnWisps(ctx, s, []string{}, "test")
if err != nil {
t.Fatalf("burnWisps failed: %v", err)
}
if result.DeletedCount != 0 {
t.Errorf("DeletedCount = %d, want 0", result.DeletedCount)
}
})
t.Run("InvalidIDAbortsAtomically", func(t *testing.T) {
// Create one valid wisp
wisp := &types.Issue{
Title: "Valid wisp",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
Ephemeral: true,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, wisp, "test"); err != nil {
t.Fatalf("Failed to create wisp: %v", err)
}
// burnWisps deletes atomically within a single transaction (bd-6py7):
// a nonexistent ID makes DeleteIssue fail, rolling back the whole batch,
// so the valid wisp is NOT deleted.
if _, err := burnWisps(ctx, s, []string{"nonexistent-id", wisp.ID}, "test"); err == nil {
t.Fatal("burnWisps should error when a batch contains a nonexistent ID")
}
// The valid wisp must survive the rolled-back transaction.
got, err := s.GetIssue(ctx, wisp.ID)
if err != nil || got == nil {
t.Errorf("valid wisp should survive an aborted atomic burn: got=%v err=%v", got, err)
}
})
}
// closeWithMoleculeAutoClose (re-)closes a step through the store's Lifecycle
// role with AutoCloseMolecule set — the one path `bd close` takes on every
// route — so the library's in-transaction auto-close decides the root. The
// rule is state-derived, so re-closing an already-closed step drives it too.
func closeWithMoleculeAutoClose(t *testing.T, ctx context.Context, s storage.DoltStorage, stepID string) {
t.Helper()
ops, err := s.IssueLifecycle()
if err != nil {
t.Fatalf("IssueLifecycle(): %v", err)
}
if _, err := ops.Close(ctx, issueops.CloseRequest{
Actor: "test-actor", IssueID: stepID, Reason: "done", Session: "test-session", AutoCloseMolecule: true,
}); err != nil {
t.Fatalf("close %s with molecule auto-close: %v", stepID, err)
}
}
// TestAutoCloseCompletedMolecule tests that closing the last step auto-closes the parent molecule.
func TestAutoCloseCompletedMolecule(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("ClosesWhenAllStepsComplete", func(t *testing.T) {
// Create molecule root
root := &types.Issue{
Title: "Auto-close molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create two steps — one closed, one open
step1 := &types.Issue{
Title: "Step 1",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
step2 := &types.Issue{
Title: "Step 2",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
for _, step := range []*types.Issue{step1, step2} {
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep: %v", err)
}
}
// Close step2 (the last open step)
if err := s.CloseIssue(ctx, step2.ID, "done", "test-actor", "test-session"); err != nil {
t.Fatalf("Failed to close step2: %v", err)
}
// Now trigger auto-close
closeWithMoleculeAutoClose(t, ctx, s, step2.ID)
// Verify root is now closed
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusClosed {
t.Errorf("Root status = %q, want %q", updatedRoot.Status, types.StatusClosed)
}
})
t.Run("DoesNotCloseWhenStepsRemain", func(t *testing.T) {
// Create molecule root
root := &types.Issue{
Title: "Incomplete molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create two steps — one closed, one still open
step1 := &types.Issue{
Title: "Closed step",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
step2 := &types.Issue{
Title: "Open step",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
for _, step := range []*types.Issue{step1, step2} {
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep: %v", err)
}
}
// Auto-close after closing step1 — step2 still open
closeWithMoleculeAutoClose(t, ctx, s, step1.ID)
// Verify root is still open
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusOpen {
t.Errorf("Root status = %q, want %q (steps still open)", updatedRoot.Status, types.StatusOpen)
}
})
t.Run("NoOpForOrphanIssue", func(t *testing.T) {
// Create an issue not part of any molecule
orphan := &types.Issue{
Title: "Orphan issue",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, orphan, "test"); err != nil {
t.Fatalf("Failed to create orphan: %v", err)
}
// Should not panic or error — just no-op
closeWithMoleculeAutoClose(t, ctx, s, orphan.ID)
})
t.Run("NoOpForAlreadyClosedMolecule", func(t *testing.T) {
// Create molecule root that's already closed
root := &types.Issue{
Title: "Already closed molecule",
Status: types.StatusClosed,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
step := &types.Issue{
Title: "Step in closed mol",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Should not panic — early return because root is already closed
closeWithMoleculeAutoClose(t, ctx, s, step.ID)
})
t.Run("ClosesWhenReparentedStepExcluded", func(t *testing.T) {
// Create molecule root (Epic A)
root := &types.Issue{
Title: "Epic with reparented child",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Labels: []string{BeadsTemplateLabel},
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, root, "test"); err != nil {
t.Fatalf("Failed to create root: %v", err)
}
// Create 3 child steps with dotted IDs (triggers Strategy 2 in loadDescendants)
var steps []*types.Issue
for i := 1; i <= 3; i++ {
step := &types.Issue{
ID: fmt.Sprintf("%s.%d", root.ID, i),
Title: fmt.Sprintf("Step %d", i),
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, step, "test"); err != nil {
t.Fatalf("Failed to create step %d: %v", i, err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: step.ID,
DependsOnID: root.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add parent-child dep for step %d: %v", i, err)
}
steps = append(steps, step)
}
// Create Epic B for reparenting target
epicB := &types.Issue{
Title: "Epic B (reparent target)",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, epicB, "test"); err != nil {
t.Fatalf("Failed to create Epic B: %v", err)
}
// Reparent step 3: remove old parent dep, add new one to Epic B
if err := s.RemoveDependency(ctx, steps[2].ID, root.ID, "test"); err != nil {
t.Fatalf("Failed to remove old parent dep: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: steps[2].ID,
DependsOnID: epicB.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add new parent dep: %v", err)
}
// Close steps 1 and 2 (the remaining children of Epic A)
for _, step := range steps[:2] {
if err := s.CloseIssue(ctx, step.ID, "done", "test-actor", "test-session"); err != nil {
t.Fatalf("Failed to close %s: %v", step.ID, err)
}
}
// Trigger auto-close — should succeed since only 2 children remain
closeWithMoleculeAutoClose(t, ctx, s, steps[1].ID)
// Verify root auto-closed (reparented step should be excluded from molecule)
updatedRoot, err := s.GetIssue(ctx, root.ID)
if err != nil {
t.Fatalf("Failed to get root: %v", err)
}
if updatedRoot.Status != types.StatusClosed {
t.Errorf("Root status = %q, want %q (reparented step should be excluded from molecule)", updatedRoot.Status, types.StatusClosed)
}
})
}
// TestFindStaleMolecules tests detection of complete-but-unclosed molecules.
func TestFindStaleMolecules(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
// Create a stale molecule: open epic with all children closed
staleRoot := &types.Issue{
Title: "Stale molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, staleRoot, "test"); err != nil {
t.Fatalf("Failed to create stale root: %v", err)
}
closedChild := &types.Issue{
Title: "Closed child",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, closedChild, "test"); err != nil {
t.Fatalf("Failed to create closed child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: closedChild.ID,
DependsOnID: staleRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Create a non-stale molecule: open epic with open children
activeRoot := &types.Issue{
Title: "Active molecule",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, activeRoot, "test"); err != nil {
t.Fatalf("Failed to create active root: %v", err)
}
openChild := &types.Issue{
Title: "Open child",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, openChild, "test"); err != nil {
t.Fatalf("Failed to create open child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: openChild.ID,
DependsOnID: activeRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
t.Run("FindsStaleNotActive", func(t *testing.T) {
result, err := findStaleMolecules(ctx, s, false, false, false)
if err != nil {
t.Fatalf("findStaleMolecules failed: %v", err)
}
// Should find the stale molecule
found := false
for _, mol := range result.StaleMolecules {
if mol.ID == staleRoot.ID {
found = true
if mol.TotalChildren != 1 {
t.Errorf("TotalChildren = %d, want 1", mol.TotalChildren)
}
if mol.ClosedChildren != 1 {
t.Errorf("ClosedChildren = %d, want 1", mol.ClosedChildren)
}
}
if mol.ID == activeRoot.ID {
t.Error("Should not find active molecule as stale")
}
}
if !found {
t.Errorf("Did not find stale molecule %s in results", staleRoot.ID)
}
})
t.Run("BlockingFilter", func(t *testing.T) {
// Create an issue blocked by the stale molecule
blockedIssue := &types.Issue{
Title: "Blocked by stale",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, blockedIssue, "test"); err != nil {
t.Fatalf("Failed to create blocked issue: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: blockedIssue.ID,
DependsOnID: staleRoot.ID,
Type: types.DepBlocks,
}, "test"); err != nil {
t.Fatalf("Failed to add blocking dep: %v", err)
}
// With blocking filter, should find the stale molecule
result, err := findStaleMolecules(ctx, s, true, false, false)
if err != nil {
t.Fatalf("findStaleMolecules (blocking) failed: %v", err)
}
found := false
for _, mol := range result.StaleMolecules {
if mol.ID == staleRoot.ID {
found = true
if mol.BlockingCount == 0 {
t.Error("Expected blocking count > 0")
}
}
}
if !found {
t.Errorf("Did not find blocking stale molecule %s", staleRoot.ID)
}
})
t.Run("UnassignedFilter", func(t *testing.T) {
// Create an assigned stale molecule
assignedRoot := &types.Issue{
Title: "Assigned stale",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
Assignee: "some-agent",
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, assignedRoot, "test"); err != nil {
t.Fatalf("Failed to create assigned root: %v", err)
}
assignedChild := &types.Issue{
Title: "Assigned child closed",
Status: types.StatusClosed,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, assignedChild, "test"); err != nil {
t.Fatalf("Failed to create assigned child: %v", err)
}
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: assignedChild.ID,
DependsOnID: assignedRoot.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dep: %v", err)
}
// Unassigned filter should exclude the assigned molecule
result, err := findStaleMolecules(ctx, s, false, true, false)
if err != nil {
t.Fatalf("findStaleMolecules (unassigned) failed: %v", err)
}
for _, mol := range result.StaleMolecules {
if mol.ID == assignedRoot.ID {
t.Errorf("Unassigned filter should exclude assigned molecule %s", assignedRoot.ID)
}
}
})
}
// TestBuildBlockingMap tests the helper that builds the blocking relationship map.
func TestBuildBlockingMap(t *testing.T) {
t.Parallel()
t.Run("EmptyInput", func(t *testing.T) {
result := buildBlockingMap(nil)
if len(result) != 0 {
t.Errorf("Expected empty map, got %d entries", len(result))
}
})
t.Run("SingleBlocker", func(t *testing.T) {
blocked := []*types.BlockedIssue{
{
Issue: types.Issue{ID: "issue-1"},
BlockedByCount: 1,
BlockedBy: []string{"blocker-1"},
},
}
result := buildBlockingMap(blocked)
if issues, ok := result["blocker-1"]; !ok {
t.Error("Expected blocker-1 in map")
} else if len(issues) != 1 || issues[0] != "issue-1" {
t.Errorf("blocker-1 blocks %v, want [issue-1]", issues)
}
})
t.Run("MultipleBlockers", func(t *testing.T) {
blocked := []*types.BlockedIssue{
{
Issue: types.Issue{ID: "issue-1"},
BlockedByCount: 2,
BlockedBy: []string{"blocker-a", "blocker-b"},
},
{
Issue: types.Issue{ID: "issue-2"},
BlockedByCount: 1,
BlockedBy: []string{"blocker-a"},
},
}
result := buildBlockingMap(blocked)
// blocker-a blocks both issue-1 and issue-2
if issues, ok := result["blocker-a"]; !ok {
t.Error("Expected blocker-a in map")
} else if len(issues) != 2 {
t.Errorf("blocker-a blocks %d issues, want 2", len(issues))
}
// blocker-b blocks only issue-1
if issues, ok := result["blocker-b"]; !ok {
t.Error("Expected blocker-b in map")
} else if len(issues) != 1 {
t.Errorf("blocker-b blocks %d issues, want 1", len(issues))
}
})
}
// TestPostCreateWritesDoltCommit tests that post-create metadata (deps, labels)
// is committed to Dolt after issue creation (GH#2009 regression test).
func TestPostCreateWritesDoltCommit(t *testing.T) {
t.Parallel()
ctx := context.Background()
tmpDir := t.TempDir()
testDB := filepath.Join(tmpDir, ".beads", "beads.db")
s := newTestStore(t, testDB)
t.Run("LabelsPersistedAfterCommit", func(t *testing.T) {
// Create an issue
issue := &types.Issue{
Title: "Issue with label",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, issue, "test"); err != nil {
t.Fatalf("Failed to create issue: %v", err)
}
// Add label (post-create write)
if err := s.AddLabel(ctx, issue.ID, "important", "test"); err != nil {
t.Fatalf("Failed to add label: %v", err)
}
// Commit (like postCreateWrites does)
if err := s.Commit(ctx, "test: post-create metadata"); err != nil {
// Dolt may return "nothing to commit" if auto-commit is on
t.Logf("Commit returned: %v (may be expected with auto-commit)", err)
}
// Verify label is retrievable
labels, err := s.GetLabels(ctx, issue.ID)
if err != nil {
t.Fatalf("Failed to get labels: %v", err)
}
found := false
for _, l := range labels {
if l == "important" {
found = true
}
}
if !found {
t.Errorf("Label 'important' not found after commit, got: %v", labels)
}
})
t.Run("DependencyPersistedAfterCommit", func(t *testing.T) {
// Create parent and child issues
parent := &types.Issue{
Title: "Parent issue",
Status: types.StatusOpen,
Priority: 1,
IssueType: types.TypeEpic,
CreatedAt: time.Now(),
}
child := &types.Issue{
Title: "Child issue",
Status: types.StatusOpen,
Priority: 2,
IssueType: types.TypeTask,
CreatedAt: time.Now(),
}
if err := s.CreateIssue(ctx, parent, "test"); err != nil {
t.Fatalf("Failed to create parent: %v", err)
}
if err := s.CreateIssue(ctx, child, "test"); err != nil {
t.Fatalf("Failed to create child: %v", err)
}
// Add dependency (post-create write)
if err := s.AddDependency(ctx, &types.Dependency{
IssueID: child.ID,
DependsOnID: parent.ID,
Type: types.DepParentChild,
}, "test"); err != nil {
t.Fatalf("Failed to add dependency: %v", err)
}
// Commit
if err := s.Commit(ctx, "test: post-create dependency"); err != nil {
t.Logf("Commit returned: %v (may be expected with auto-commit)", err)
}
// Verify dependency is retrievable
deps, err := s.GetDependenciesWithMetadata(ctx, child.ID)
if err != nil {
t.Fatalf("Failed to get dependencies: %v", err)
}
found := false
for _, dep := range deps {
if dep.ID == parent.ID && dep.DependencyType == types.DepParentChild {
found = true
}
}
if !found {
t.Errorf("Parent-child dependency not found after commit")
}
})
}