beads/integrations
matt wilkie 4d08edbeb7
test(mcp): make validation baseline hermetic (#4195)
Why: MCP validation was failing on hard-coded local paths, shared Dolt test
locations, and a missing build dependency, which made dependency PR checks
noisy.

Squashed rebase of the original two PR commits onto the rewritten
gastownhall/beads history. Composed with 6d7eb5b3b "fix(mcp): tolerate
current bd JSON shapes (#4253)": upstream's MCP_ROOT path fixes and
tolerant embeddeddolt assertions are kept, while this PR adds the
bd-init isolation-flag skip fixture, per-test BEADS_DIR workspaces,
the PYTHONPATH subprocess helper, removal of the no-signal compaction
test, and the build dev dependency.

Agent-Signature: codex-gpt-5.5-medium on behalf of matt wilkie
Agent-Signature: claude-unknown-model-high on behalf of matt wilkie
2026-06-20 20:44:15 -07:00
..
beads-mcp test(mcp): make validation baseline hermetic (#4195) 2026-06-20 20:44:15 -07:00
claude-code docs: update user-facing URLs from steveyegge/beads to gastownhall/beads 2026-04-24 08:17:42 -07:00
junie docs: update user-facing URLs from steveyegge/beads to gastownhall/beads 2026-04-24 08:17:42 -07:00