beads/.github/scripts
Julian Knutsen b1a0690249
ci: pin four hash-placed proxied tests off overloaded legacy shards 5 and 3 (#7172)
Main's "Test (proxied-server cmd 5/15)" has hit the 15m -test.timeout in
6 of the 9 Main runs since #7129 where the shard ran to completion.
That PR renamed 12 proxied tests into TestProxiedServer* discovery.
They are not in the frozen 15-shard legacy block, so they hash-place,
and two landed on shard 5:
TestProxiedServerStorageClass (nine parallel inits, the heaviest of the
12) and TestProxiedServerServeRefusesAStaleCheckpointWithGone. Shard 5
went from 430-620s of job time to 800-950s. In those runs the timeout
fired while TestProxiedServerMolReadyGated's parallel subtests were still
queued behind the rest of the shard. That test is the victim, not a
pathological one. Shard 3 (also hash-loaded) runs 810-870s, within about
a minute of the same limit.

Measured locally (4 pinned CPUs, GOMAXPROCS=4), shard 5 took 897s with
its current test set and 524s with the pre-#7129 set.

Pin those two tests, plus shard 3's two heaviest hash-placed tests
(TestProxiedServerListComments and
TestProxiedServerServeRefusesAStreamOnADisabledJournal), onto the legacy
shards with the lowest measured job time: 14, 7, 4 and 1. Every test
already listed in the block stays where it is, so shard 5 is back to its
pre-#7129 test set. pr-risk.yml's fork jobs read the same block, so they
get the same relief. The script's 15m timeout, the job and step
timeouts, and the Bazel 30-shard block are unchanged. The block header
and the generator's legacy header now say a reviewed pin is allowed.

Co-authored-by: Gas City Adopt-PR <adopt-pr@gascity.local>
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-10-04 00:15:08 -07:00
..
bazel-farm-authorize.sh ci(bazel): remote-execution Bazel lanes for allowlisted fork authors (advisory) (#6994) 2026-09-30 14:54:06 -07:00
bazel-gate.sh ci(bazel): fork PRs execute on rbe-west's fork pool (fork-ro/fork-rw), cache fallback (#7136) 2026-10-03 12:10:14 -07:00
ci-capability-selector.sh ci: shadow PR Risk capability ownership (bd-8yjq8.1) (#5324) 2026-08-03 20:06:16 -07:00
ci-embedded-tier.sh Tier embedded Dolt CI for PRs (bd-0gz) (#3459) 2026-04-24 07:53:23 -07:00
ci-gate.sh Add PR CI wrapper command surface (#4211) 2026-05-29 18:52:53 -07:00
docs-render-check.sh chore: purge deleted docs-pipeline references from release tooling, CI, and repo plumbing 2026-07-12 11:07:26 -07:00
embedded-cmd-test-shards.txt ci(bazel): embedded-Dolt tier 20/5 → 50/15 duration-balanced Bazel shards (F1) (#7156) 2026-10-03 21:30:03 -07:00
embedded-storage-test-shard.sh feat(httpapi): opt-in large issues:batchApply envelope (≤1000 items, one transaction) (#7051) 2026-10-01 08:32:56 -07:00
embedded-storage-test-shards.txt ci(bazel): embedded-Dolt tier 20/5 → 50/15 duration-balanced Bazel shards (F1) (#7156) 2026-10-03 21:30:03 -07:00
embedded-test-shard.sh Rebalance embedded cmd CI shards (bd-8zg) (#3499) 2026-04-25 17:58:51 -07:00
proxied-cmd-test-shards.txt ci: pin four hash-placed proxied tests off overloaded legacy shards 5 and 3 (#7172) 2026-10-04 00:15:08 -07:00
proxied-test-shard.sh fix(dolt): server-mode bd ready never wakes expired defers (re-proposes #6082) (#6424) 2026-09-30 15:53:22 -07:00
server-storage-test-shard.sh ci: PR-CI lane runs the full internal/storage/dolt suite against a live Dolt server (#5836) 2026-08-19 20:39:38 -07:00
server-storage-test-shards.txt docs(ci): update shared cloud routing shard rationale (#6432) 2026-09-27 01:57:07 -07:00