beads/.github/workflows
Bee fa53c7e2a6 ci(main): bound the Test matrix's per-package deadline (wy-5b5fbl)
Both legs of main.yml's `test` matrix run every package in one `./...`
invocation with no `-timeout`, so they rode go test's DEFAULT 10m
per-package deadline. cmd/bd has outgrown it: scripts/test.sh already
documents the floor for local runs (~1090s of test time / ~18min wall for
cmd/bd, which is why TEST_TIMEOUT defaults to 25m there), and on
2026-09-01 main run 33497003321 failed twice with
`panic: test timed out after 10m0s` in cmd/bd AND, as collateral in the
same parallel coverage pass, internal/storage/uow — with DIFFERENT tests
only 1-12s in flight on each attempt (a package-wide crawl on the 2-core
coverage-instrumented runner, not a hang), while a rerun of the identical
tree passed.

Give both legs the repo's own 25m per-package deadline and keep it inside
one finite job budget (`timeout-minutes: 45`), the shape
test-embedded-conformance already documents: the go deadline fires first
and prints goroutine stacks, so a REAL hang stays diagnosable instead of
being cut off by a bare job kill.

The ubuntu leg's `matrix.test-flags` is dead config — its coverage step
hardcodes its own flags — so the ubuntu deadline goes on the gotestsum
line and the macOS one on `test-flags`, the only leg that reads it.
scripts/ci_workflow_test.go pins that macOS string exactly, so the
ratchet moves with it (adversarial review F1: without this the diff is a
deterministic red on main and on every PR).

Verified: go test -count=1 ./scripts rc=0 (the ci_workflow ratchet over
the patched main.yml); actionlint .github/workflows/main.yml rc=0.
2026-09-01 05:23:00 -07:00
..
ci-measurements.yml fix(ci): pin the Dolt CLI — 2.3.0 broke DOLT_RESET on fresh databases (ga-m0dlk) (#5894) 2026-08-20 20:59:27 -07:00
conformance.yml ci: give conformance explicit timeout budgets (#5073) 2026-07-28 09:01:39 -07:00
cross-version-smoke.yml build(deps): bump the actions group across 1 directory with 3 updates (#5059) 2026-07-25 19:05:02 -07:00
deploy-pages-redirect.yml build(deps): bump actions/checkout from 7.0.0 to 7.0.1 (#5016) 2026-07-25 08:52:22 -07:00
docs-autofix.yml build(deps): bump actions/checkout from 7.0.0 to 7.0.1 (#5016) 2026-07-25 08:52:22 -07:00
docs-mintlify.yml build(deps): bump the actions group across 1 directory with 3 updates (#5059) 2026-07-25 19:05:02 -07:00
main.yml ci(main): bound the Test matrix's per-package deadline (wy-5b5fbl) 2026-09-01 05:23:00 -07:00
migration-test.yml fix: bound and retry apt-get calls in CI to avoid unbounded 15-minute job timeout (#5810) 2026-08-19 11:47:22 -07:00
nightly.yml fix(ci): pin the Dolt CLI — 2.3.0 broke DOLT_RESET on fresh databases (ga-m0dlk) (#5894) 2026-08-20 20:59:27 -07:00
nix-build.yml chore(deps): bump the actions group with 5 updates 2026-08-07 20:49:50 +00:00
pr-risk.yml fix(ci): pin the Dolt CLI — 2.3.0 broke DOLT_RESET on fresh databases (ga-m0dlk) (#5894) 2026-08-20 20:59:27 -07:00
pr.yml ci: add advisory cyclomatic complexity reporting (#6081) 2026-08-30 19:05:17 -07:00
proxied-local-smoke.yml fix(dbproxy): verified identity for the managed proxied-server lifecycle (adoption, cleanup, kills) (#5013) 2026-07-26 12:52:51 -07:00
regression.yml fix(ci): pin the Dolt CLI — 2.3.0 broke DOLT_RESET on fresh databases (ga-m0dlk) (#5894) 2026-08-20 20:59:27 -07:00
release.yml fix: bound and retry apt-get calls in CI to avoid unbounded 15-minute job timeout (#5810) 2026-08-19 11:47:22 -07:00
test-pypi.yml build(deps): bump the actions group across 1 directory with 3 updates (#5059) 2026-07-25 19:05:02 -07:00
update-flake-lock.yml chore(deps): bump the actions group with 5 updates 2026-08-07 20:49:50 +00:00
update-vendor-hash.yml chore(deps): bump the actions group with 5 updates 2026-08-07 20:49:50 +00:00