pr.yml's bazel.yml call now passes integration: "on", and its ci-gate
requires BAZEL_INTEGRATION (bazel-integration's job.status output, a
missing result reading as skipped). The lane stays remote-only:
bazel-gate.sh allows it to skip in modes local (fork and Dependabot PRs,
until the farm has a read-only cache for them) and skip, never in remote.
bazel-farm.yml's advisory call runs it too.
The integration test step gets 45 minutes (job 55) for cold PR compiles;
the policy test keeps it at or above a 20-minute cold compile plus
.bazelrc's test:integration --test_timeout (the 1200s per-action cap).
The integration input (default "on") stays for callers that want the lane
off; pr.yml's call inputs are pinned, and the gate simulation now covers
the lane skipped, failed and cancelled in each mode.
Co-authored-by: Gas City Adopt-PR <adopt-pr@gascity.local>
Co-authored-by: Claude Opus 5.5 (1M context) <noreply@anthropic.com>