The per-subtest project split multiplied bd init calls (each runs the full
migration chain on a fresh DB): epic 2->8, set-state 1->4, unclaim 2->9,
defer 1->7. That is added, not saved, wall-clock on already-saturated
shards and pushed shard 4/8 over the 15m budget. Revert those five suites
to one shared project per test function (the read-suite pattern), and move
the pre-existing heaviest suite (Ready: 36 subtests / 34 inits) off the
overloaded shard 4 onto the near-idle shard 8.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>