beads/.github
coffeegoddd☕️✨ 7caa8cd554 test(proxied): cut shard-4 timeout — revert per-subtest project splits, move Ready to shard 8
The per-subtest project split multiplied bd init calls (each runs the full
migration chain on a fresh DB): epic 2->8, set-state 1->4, unclaim 2->9,
defer 1->7. That is added, not saved, wall-clock on already-saturated
shards and pushed shard 4/8 over the 15m budget. Revert those five suites
to one shared project per test function (the read-suite pattern), and move
the pre-existing heaviest suite (Ready: 36 subtests / 34 inits) off the
overloaded shard 4 onto the near-idle shard 8.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-20 15:55:17 -07:00
..
images Prepare for public launch: comprehensive examples, docs, and tooling 2025-10-12 11:25:29 -07:00
pages-redirect docs: redirect legacy GitHub Pages site to Mintlify (#4759) 2026-07-13 14:19:13 -07:00
scripts test(proxied): cut shard-4 timeout — revert per-subtest project splits, move Ready to shard 8 2026-07-20 15:55:17 -07:00
workflows feat(unclaim): add --if-assignee conditional release (CAS inverse of claim) (#4727) 2026-07-18 03:23:13 -07:00
CODEOWNERS chore: purge deleted docs-pipeline references from release tooling, CI, and repo plumbing 2026-07-12 11:07:26 -07:00
copilot-instructions.md Add PR preflight and contributor intake guidance (#3470) 2026-04-24 15:44:06 -07:00
dependabot.yml build(deps): bump fastmcp, pydantic, pydantic-settings and regen uv.lock in /integrations/beads-mcp (#4663) 2026-07-08 09:05:30 -07:00
PULL_REQUEST_TEMPLATE.md docs: add lightweight PR description template (#3750) 2026-05-06 12:32:16 -07:00