The per-subtest project split multiplied bd init calls (each runs the full migration chain on a fresh DB): epic 2->8, set-state 1->4, unclaim 2->9, defer 1->7. That is added, not saved, wall-clock on already-saturated shards and pushed shard 4/8 over the 15m budget. Revert those five suites to one shared project per test function (the read-suite pattern), and move the pre-existing heaviest suite (Ready: 36 subtests / 34 inits) off the overloaded shard 4 onto the near-idle shard 8. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| ci-embedded-tier.sh | ||
| ci-gate.sh | ||
| docs-render-check.sh | ||
| embedded-cmd-test-shards.txt | ||
| embedded-test-shard.sh | ||
| proxied-cmd-test-shards.txt | ||
| proxied-test-shard.sh | ||